
- The electro mechanical works were undertaken by GIP – Schnell at SWCC with cement hopper, screw conveyor, installing of silo discharge telescopic chutes with vibrating screen and flow control gate in addition to weighing system for jumpo bags, Vacon drives were installed to control the cement screw conveyor and vibrating screen.