Suez Dedusting Project (Boldrocchi)

 

For the upgrade of RM/ KILN Baghouse and Cooler GBF into BF and HX

  • Power System Study and coordination study
  • Earthing, cabling, lighting, LV Distribution, Motor Control Centers, ACC, RPC Engineering, supplying and erection. 
  • Motor and new variable speed drives with cabling erection and assist in startup
  • Automation and integration with the ACS450.